![]() ![]() While testing the coefficient of determination shows that all independent variables in this study have significant effect on the quality of performance construction project implementation by 83.2% (R = 0.832), and the remaining 16.8% is influenced by other factors not included in this study. ![]() Hartoto, M.Si STAI Miftahul Ulum Tanjungpinang. MANAJEMEN PROYEK BAB 2: MENILAI (EVALUASI) PROYEK Ir. Akan tetapi pada akhirnya kami mengakui bahwa tulisan ini terdapat beberapa kekurangan dan jauh dari kata sempurna, sebagaimana pepatah. Based on the results of the analysis in this study partially, material procurement planning is in accordance with specifications, material purchases are in accordance with the planning, material delivery according to specifications and installation schedules, material storage and security, material use in accordance with material characteristics, and material control by the logistics department has an effect on performance quality of construction project implementation. yang memiliki minat terhadap pembahasan tentang Manajemen Proyek. ![]() Data analysis using Multiple Linear Regression Analysis with the help of SPSS 19.0 application. This research method was carried out quantitatively and qualitatively. This study aims to determine the effect of material management on the performance quality of building construction projects in Denpasar City. ![]() With good control on material management, contractors will benefit from the effective use of materials. Therefore, good resource management is needed so that the project is cost effective, on time and meets the specified quality. A construction project is an activity to achieve results in the form of infrastructure. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |